[ninja_form id=5]
Institutional

One Guia Hill

  • Oct 29, 2013
, MACAU, ,
Architect: JWCC Architecture
Contractor: Lirong Construction & Engineering Company Ltd.
Structural engineer: Chui Sai Peng Engineer
Products Used: Everdure Caltite, 3CC
Type: Residential
Where Used:

Site area consists of 2,453.40 square meters. There are three residential blocks, total tenement for 30, 70 parking spaces, 14 motorcycle parking spaces, one layer of basement. Whole basement structure is using Cementaid’s HPI WP System. No membrane & tanking system used to save construction time & cost.

[ninja_form id=5]