[ninja_form id=5]
Institutional
Methodist Church
- Oct 25, 2016
271 Queen's Road East, Hong Kong , ,
Architect: | WCWP Int'l Ltd. |
Contractor: | Penta Ocean Construction Co Ltd |
Structural engineer: | CM Wong & Associates Ltd |
Products Used: | Everdure Caltite |
Type: | Public |
Where Used: |
A new built Methodist Church with one level basement using with Caltite waterproofing concrete system on basement wall, slab and lift pit, with no membrane design for the basement struture.
[ninja_form id=5]