[ninja_form id=5]
Institutional

St Stephen College, Stanley

  • Oct 26, 2015
22 Tung Tau Wan Road, Stanley, Hong Kong , ,
Architect: Philip Liao
Contractor: Ching Lee Engineering Ltd.
Structural engineer: JMK Consulting Engineering Ltd.
Products Used: Everdure Caltite
Type: Educational
Where Used:

Ho Shung Yuk Building of St. Stephen’s College Preparatory School was built in 2016. The building is four stories high, with a climbing wall on the ground floor, classrooms and libraries on the first and second floors, a teacher’s room and greenhouse on the third floor, and an auditorium in the building. Everdure Caltite System has been specified for waterproofing for Screen Wall from 1/F to 2/F, for long-term reliable performance

[ninja_form id=5]