[ninja_form id=5]
Institutional
Canadian International School
- Sep 9, 2007
36 Nam Long Shan Road Wong Chuk Hang, , Hong Kong,
Architect: | P&T Architects |
Contractor: | Woon Lee Const Co Ltd |
Structural engineer: | P&T Architects and Engineers Ltd |
Products Used: | Everdure Caltite |
Type: | Educational |
Where Used: |
Construction of Aberdeen Campus The school campus, designed by Canadian architect Norman Grey-Noble, was built in three main phases over years. The third phase, the Leo Lee Arts Centre (LLAC), was completed in the spring of 2008. The LLAC is a HK$100 million facility with a 604-seat auditorium and teaching facilities for music, drama, dance and visual arts. Caltite system has been applied in the Basement 1 Screen Wall, for long-term and maintenance-free protection.
[ninja_form id=5]