[ninja_form id=5]
Institutional
Carrefour of Qingdao across the street
- Jan 9, 2007
Qingdao, Qingdao, , China
Architect: | Not know |
Contractor: | The Second Engineering Bureau of China Railway Tunnel Group |
Structural engineer: | Not know |
Products Used: | Everdure Caltite |
Type: | Commercial |
Where Used: |
1.Location : slab/ floor / Structure wall 2.Features : Underground water table is quite high in this area, and membrane system will have lots of defects in such a humid condition. Thus the developer agreed to choose HPI additive system. Simple and fast construction, no maintenance and lower construction cost, ensure the long-term durability of reinforced concrete.
[ninja_form id=5]