[ninja_form id=5]
Institutional

Marina South

  • Sep 24, 2013
No.8 Ap Lei Chau Drive District, Hong Kong , ,
Architect: CYS Architects Ltd.
Contractor: Man Kit Const & Eng Co Ltd.
Structural engineer: JMK Consulting Engineering Ltd.
Products Used: Everdure Caltite
Type: Residential
Where Used:

Marina South is a luxury and quality residential development by China Overseas Property Limited completed in 2016. The high rise residential overlooking the Aberdeen Marina consists of 2 towers of total 144 units with club house facilities. Cementaid’s Everdure Caltite System had been specified by the consultant architect for the basement and screen wall for a permanently dry protection in the hillside and seaside environment.

[ninja_form id=5]