[ninja_form id=5]
Institutional

Nansha Phoenix I Bridge

  • Dec 30, 2011
NanSha Guangzhou, Guangzhou, , China
Architect: Not know
Contractor: CCCC Second Harbor Consultants Co.,Ltd
Structural engineer: Nil
Products Used: Everdure Caltite
Type: Bridges
Where Used:

1. Build across the Jiao men waterway :Connecting the Jiaomen waterway, Mountain Peninsula, The upper Hengli waterway, Hengli Peninsula and Under Hengli waterways, At the end of the Pearl River Management district.at Nansha Guangzhou, Guangdong, China 2. Location Used: Cap (footing) and Pier (column) 3. Features Provides corrosion-proof to cap (footing) and pier (column) concrete, simple and fast construction, low maintenance and construction cost, enhance durability of the bridge concrete structure.

[ninja_form id=5]