[ninja_form id=5]
Institutional
One Guia Hill
- Oct 29, 2013
, MACAU, ,
Architect: | JWCC Architecture |
Contractor: | Lirong Construction & Engineering Company Ltd. |
Structural engineer: | Chui Sai Peng Engineer |
Products Used: | Everdure Caltite, 3CC |
Type: | Residential |
Where Used: |
Site area consists of 2,453.40 square meters. There are three residential blocks, total tenement for 30, 70 parking spaces, 14 motorcycle parking spaces, one layer of basement. Whole basement structure is using Cementaid’s HPI WP System. No membrane & tanking system used to save construction time & cost.
[ninja_form id=5]