[ninja_form id=5]
Institutional

TVB New TV City (2003)

  • Nov 30, 2000
77 Chun Choi Street Tseung Kwan O Industrial Estate , TKO, Hong Kong, ,
Architect: Leigh & Orange Consultants Group
Contractor: Hip Hing Construction Co., Ltd.
Structural engineer: Meinhardt (C&S) Ltd
Products Used: Everdure Caltite
Type: Public
Where Used:

The HK$2.2 billion facility officially opened on 12 October 2003. The 110,000 square-metre facility, which replaced TV City, was designed to allow for future developments such as digital television production. The facilities include an 11-story broadcasting centre, workshops, a newsroom, a satellite antenna farm, two outdoor shooting sites and 22 production studios, of which “Studio 1” is one of the largest studio amongst all commercial television broadcasters in Asia in the time. For the Underground Oil Chamber Slab and Screen Wall, Caltite System had been applied for reliable waterproofing and corrosion-proof protection.

[ninja_form id=5]