In HAECO Aircraft Maintenance Hangar No. 3A, Main Contract Work Project, Cementaid Everdure Caltite Waterproofing System was specified and used at the pump room slab, the water tank’s slab and the sprinkler tank to provide waterproofing and maintenance free...
The Equine Pool at Shatin Racecourse was waterproofed with Cementaid Everdure Caltite System. At the same time, the Caltite concrete does not absorb any water from the pool and is therefore hygeinic and free from any dangerous bacteria or germs that could infect these...
Everdure Caltite System was used at the ground slab of the horse stables to preserve a hygeinic floor that was always dry, never constantly wet or damp and transformer room to prevent stray current corrosion.