Institutional

SKH St. James’ Primary School, St. James’ Settlement and St. James’ Church

  • Jun 25, 2011
No.110 Kennedy Road Wanchai, Hong Kong , ,
Architect: P&T Architects
Contractor: Lap Kai Engineering Co Ltd
Structural engineer: P&T Architects and Engineers Ltd
Products Used: Everdure Caltite
Type: Educational
Where Used:

The redevelopment project comprises demolition of the former 5-storey primary school, church and welfare centre buildings, which were built in the 1960s, and reconstruction of a 16-storey building which accommodates both the original and extra facilities to cater for the needs for upgrading the school facilities and the increasing demand for the church and social welfare services. The construction with GFA area of 26,300 square meter completed in 2013. Everdure Caltite System has been applied in the footing, the pile cap, basement and screen wall for long-term reliable protection against underground water.