Institutional

Galaxy Resorts and Casino Phase 2

  • Mar 4, 2015
, MACAU, ,
Architect: Wong & Ouyang (HK) Ltd.
Contractor: 1.Top Builders Group Ltd.; 2. Sun Fook Kong –Kun Fai Engineering & Construction Co. Ltd. ; 3. Ming Shun Construction & Property Investment Ltd. ; 4. Companhia de Construcao e Engenharia Kin Pang Ltd.
Structural engineer: Rider Levett Bucknall Macau Ltd.
Products Used: Everdure Caltite, 3CC
Type: Tunnels, Hotel, Underground, Pools & Tanks
Where Used:

Due to the success performance of Phase 1 Development, Galaxy Resorts and Casino Phase 2 continuously uses Cementaid Caltite and 3CC waterproofing concrete System not only to prevent water leakage at 7/24 opening of casino back of house-underground tunnels, Casino and gambling house at basement slab and wall but also Grand Resort podium deck such as the world’s longest adventure rapids, and boasts two 150-meter-long white sand beaches. We supplied totally 75,000 square meters, Grand Resort Deck on the podium which connecting five world brand hotels to delivery perfect water-proof concrete. The construction is simple, quick, no maintenance, low overall cost, fundamentally solve the problem long-term durability of reinforced concrete.