Hijauan Kiara
- Dec 31, 2009
Architect: | |
Contractor: | Bukit Kiara Builders Sdn Bhd |
Structural engineer: | WorleyParsons Infrastructure (M) Sdn Bhd |
Products Used: | 3CC, Everdure Caltite |
Type: | Residential |
Where Used: | Roof, Pools & Tanks, Podium Deck, Water / /Fire Tanks |
The Project Hijauan Kiara sets another benchmark for luxurious high-rise living, featuring the first completed condominium development within the vicinity of Mont’Kiara to have private lift lobby concept for the homeowners. With only 188 units and a layout of not more than 2 units per floor, Hijauan Kiara is one of the lowest density and most exclusive offerings in the Mont’Kiara neighbourhood. As Bukit Kiara Properties would like to perceive this condo to be a luxurious high-rise project, naturally waterproofing system selection should be also on high-end side. One of the big consideration points is that there are many beautiful sunken baths in the master bedrooms allow for pure indulgence but this design indirectly also invites big risk of water leakage nuisance should the waterproofing system selected is not performing. The Selection of Waterproofing Specialist On this note, Cementaid HPI integral waterproofing system fits in perfectly to this requirement with provision of high quality product to luxurious project with minimal problems. As Cementaid HPI integral waterproofing system allows concrete to be hydrophobic by itself and therefore any leakage (if any) is always localized and easily arrested speedily. In most cases, water leakage could be easily identified and repaired while the structures were still under ponding test during the construction period. Upon completion of this project, Cementaid successfully delivered beautiful and permanently waterproofed sunken baths (Picture 1), swimming pools complete with podium deck (Picture 2) and others like water & tanks, rc flat roofs, bathrooms, balcony, air cond ledge, refuse area as well as toilets.