The redevelopment of the Au Shue Hung Health Centre of the Hong Kong Baptist Hospital comprised a 2-storey basement and a 10-storey medical-health-welfare building and a link-bridge to the existing hospital complex. The major components are a pathology laboratory, an elderly centre, a Chinese medical centre, a heart centre and various other special clinics and medical wards. Everdure Caltite System has been specified by the architectural consultant for waterfproofing for basement and lift pit for long-term reliable and maintenance-free performance.