MAZ International School from a humble beginning in 1991, through hard work and dedication, have led to the opening of their Shah Alam campus in 2011. This beautiful campus incorporated the use of Cementaid’s HPI integral waterproofing system of 3CC System in the waterproofing and corrosion proofing of its reinforced concrete flat roof. With the 3CC System, the owner saves zero maintenance costs, design-life durability and zero replacement costs.