Institutional

Maz International School Shah Alam Campus

Jalan Kristal 7/64 Section 7, Shah Alam, Selangor, Malaysia
Architect: c/o Developer
Contractor: Lafarge Concrete Industries Sdn Bhd
Structural engineer: c/o Developer
Products Used: 3CC
Type: Educational
Where Used: Roof

MAZ International School from a humble beginning in 1991, through hard work and dedication, have led to the opening of their Shah Alam campus in 2011. This beautiful campus incorporated the use of Cementaid’s HPI integral waterproofing system of 3CC System in the waterproofing and corrosion proofing of its reinforced concrete flat roof. With the 3CC System, the owner saves zero maintenance costs, design-life durability and zero replacement costs.