Institutional

Methodist Church

  • Oct 25, 2016
271 Queen's Road East, Hong Kong , ,
Architect: WCWP Int'l Ltd.
Contractor: Penta Ocean Construction Co Ltd
Structural engineer: CM Wong & Associates Ltd
Products Used: Everdure Caltite
Type: Public
Where Used:

A new built Methodist Church with one level basement using with Caltite waterproofing concrete system on basement wall, slab and lift pit, with no membrane design for the basement struture.