Park Mediterranean contains 3 towers of residential building with 285 flats. The pile caps, the basement slab and wall for car park, and the car ramp, are all kept permanently DRY! by Everdure Caltite System. A membrane-free basement construction has been achieved for maximum usable area and time-saving. The suspended swimming pool, kid pool, planters and water features on podium level, are waterproofed and maintenance-free for long term with Caltite System as well.

Skills

Posted on

October 5, 2021