Silversea Condominium at Amber

Originally specified membrane for the Swimming Pool, Water Features and Superstructures but as site was rushing for time, the Link Bridges from Tower 1 to Tower 4 at the 11th Storey, it made membrane application complicated and impossible. Main Contractor without hesitation, proposed Cementaid Everdure Caltite System for the Link Bridge and 3CC System to Basement, Water features and Swimming Pool. It speed up their construction time and resolved all construction joints weak point issues. Again, we proved to all parties, We delivered what we promised.