Ho Shung Yuk Building of St. Stephen’s College Preparatory School was built in 2016. The building is four stories high, with a climbing wall on the ground floor, classrooms and libraries on the first and second floors, a teacher’s room and greenhouse on the third floor, and an auditorium in the building. Everdure Caltite System has been specified for waterproofing for Screen Wall from 1/F to 2/F, for long-term reliable performance