Institutional
Zhanjiang Tiaoshun bridge
- Dec 31, 2018
Zhangjiang,, Guangdong, , China
Architect: | Guangdong Highway Design Institute CO.,LTD |
Contractor: | Guangdong Nanyue transportation investment & construction co. LTD |
Structural engineer: | Not know |
Products Used: | Everdure Caltite |
Type: | Bridges |
Where Used: |
1. Build across the bay at Zhanjiang coast area , the bridge will shorten the time and distance of the two sides of the bay. And it will be great helpful to promote the economy in this remote area. 2. Location Used: Pile Caps(G40) and Columns(G50) (tiding zone and splash area) 3. Features: Designed with 100 years lifetime, Cementaid Caltite provides corrosion-proof to cap and column concrete, simple and fast construction, maintenance free and low construction cost, enhance durability of the bridge concrete structure.