“Cementaid Everdure Caltite System was specified and used for the Coliseum’s huge Multi-Purpose Floor: Salt-water freezing pipes are embedded within the structural slab; the slab can be flooded, and then the pipes are used to freeze the Caltite concrete slab, which in...
Cementaid Everdure Caltite Waterproofing System for Ice Skating Rink, Cityplaza Ice Skating Rink Cityplaza is a compound of shopping center and three Grade-A office buildings owned and managed by Swire Properties. As one of the firsts to open and longest running ice...
Located at Mong Kok, Hong Kong. The two level basements and the podium swimming pool were waterproof with Cementaid Caltite System for its time saving and cost saving construction.