Azure Condo

3CC to 1 level Basement carpark – Residential – supply Supershield Epoxy to carpark surface. Being the first condo in Sentosa Cove of Sentosa Island and just adjacent to seafront, the Developer, Centrepoint dared not to choose any waterproofing product...

Helois @ Cairnhill Circle

Residential Development with Basement carpark using Aquapel to wall, slab, e-deck and 3CC system to swimming pool. Sames Contractor whom has used us in Lumos, continue with the same concept and adopt our concreting standard procedures on this project.

Lumos Condo @ Leonie Hill

Residential Development with 2 Levels Basement using Aquapel to the wall & slab. 3CC to Suspended swimming pool and deck. As budget issue, Main Contractor has push for Aquapel system, as a results, our site Supervisor has to work closely with the Main Contractor...

Suites @ Cairnhill

Residential Development by Hoi Hup Realty. It is a Top down Construction using 3CC to the Basement wall, slab and E-deck. Everdure Caltite were used on the Roof slab, Suspended Swimming Pool and Jacuzzi Pond. The Main Contractor has pond the Swimming pool for 14 days...

JCube

This is a 3 level basement retail project and the duration of completion for this job is just 20 months. Cementaid entered into this job knowing that it is going to be a great challenge both in terms of the constraint on site and the lead time. In this project, more...