Sentosa Merlion

Singapore’s high humidity and constant running water, mean that it can be difficult to keep iconic constructions clean and free of mold and fungus. The owners of the fantastic Sentosa Merlion chose to protect this important sculpture from staining, mold and...

Dubai Aquarium

The Dubai Aquarium is part of the US$8b Dubai Mall Complex in the United Arab Emirates (UAE). The ten million liter aquarium tank is the largest suspended aquarium in the world. The salt-water aquarium is a fitting complement to the world’s largest shopping...

British Museum Great Court

2,266 cubic metres of concrete containing Everdure Caltite used in the basement slab and retaining walls to enclose the courtyard area into the museum

SY21

SY21 is a residential development built over an underground carpark. Cementaid 3CC was used in landscaped podium levels above the carpark as the sole means of waterproofing. The 3CC deck needs no membrane at all.

101 Bay Street Port Melbourne

A 2 level basement, constructed off the busy Bay Street in Port Melbourne. The site requires the excavation of 30,000m3 of bulk excavation, installation of 238 temporary ground anchors, construction of two lift cores and 50 pad footings. The site is also below the...