68 Kimberley Road

The commercial development contains 104,200 square feet gross floor area. Everdure Caltite System has been adopted by the developer, Henderson Land, to deliver reliable waterproofing for basement wall and slab and allow easy and rapid construction.

579 Kau To Shan

Located atop of a hill site overlooking the Shatin Racecourse and Tolo Harbour, the development spawns spontaneously with the curvature of Kau To Shan Hill. The project comprises of 2 low-rise tower blocks and over 50 luxury houses. Everdure Caltite Waterproofing...

999 King's Road, Quarry Bay

The commercial building is in eastern district of Hong Kong Island with 2 levels of basement. Everdure Caltite System has been used in the pile cap, sump pit, lift pit, basement slab & wall, and water tank, for reliable and maintenance-free waterproofing.

55-57 Bisney Road, Pok Fu Lam

This grand residence located in mid-level in Hong Kong, faces a prestige sea view and contains 7,800 square meter of gross floor area with 5 mansions. Everdure Caltite System has been adopted in the slab and wall of ground floor level for reliable waterproofing and...

Commune Modern

For the 24-storey residential development of Sino Group, Everdure Caltite System has been used in pile cap, the whole carpark including basement slab and wall, and lift pit, as well as the swimming pool at podium level, for maintenance-free waterproofing and easy...