Located at the site of the former stables block in Shan Kwong Road, the new extension is a 13-storey building with a gross floor area of more than 50,000 square metres. The extension will have its own separate entrance and drop-off area and be linked by covered...
Over 12,000 cubic meters of Caltite concrete was used to waterproof parts of the basement structure, spectator terraces, link tunnels and underneath the court itself to provide a permanently, inherently DRY! and corrosion-resistant base. Eliminating the otherwise...
The fabulous glass domed roof slab itself, relies on Cementaid Everdure Caltite System to keep the casino and hotel DRY! Caltite concrete is permanent, so there will never be a need to ‘replace membranes’ at the end of their service life. Or if the...
The Pier 6 development at Gatwick was built as part of expansion plans to increase the capacity of the airport’s North Terminal. The pier bridge spans a live taxiway, and had to be sufficiently wide and high enough to allow an aircraft the size of a Boeing...