1. Seak Pai Van CN5a – Ip Heng Building 2. Location : Basement Car Park Area A, B, C ; Basement Car Park Area #1 – #9 3. Grade 30 concrete treated with DIAMITE which the concrete would be considered suitable for carparks and heavy pedestrian...
The Praia is located in Macau’s most prestigious residential region. Waterfront development potential of emerging, and carefully build a full sea view, double deluxe clubhouse, with area of one hundred and eighty thousand square feet, has three main themes,...
Site area consists of 2,453.40 square meters. There are three residential blocks, total tenement for 30, 70 parking spaces, 14 motorcycle parking spaces, one layer of basement. Whole basement structure is using Cementaid’s HPI WP System. No membrane & tanking...
Due to the success performance of Phase 1 Development, Galaxy Resorts and Casino Phase 2 continuously uses Cementaid Caltite and 3CC waterproofing concrete System not only to prevent water leakage at 7/24 opening of casino back of house-underground tunnels, Casino and...
Padma Hotel is hotel in Karawang, West Java. Developed by . 3CC 10 was used in Roof Mezzanine. HPI works were completed 16 July 2014 and presently in perfect condition.