Educational

MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES (R )

  • Jan 31, 2019
MACAU, MACAU
Architect: Eddie Wong & Associates Ltd.
Contractor: Ming Shun Construction & Property Investment Ltd.
Structural engineer: Eddie Wong & Associates Ltd.
Type: Educational
Products used: Everdure Caltite
Where used: Basement, Walls, Water / /Fire Tanks

The Faculty of Humanities and Arts is the third largest faculty in the Macau University of Science and Technology, The construction of the Complex Academic Building of College of Humanities and Arts – Block “R” includes a 2-storey basement and 7-storey above the ground floor. The height of the building is 30.75M. Caltite System has been applied in the basement slab, (B1 to B2), basement wall and water tank for long-term reliable waterproofing.